



About Company
Our History
A group of professional Engineers with extensive experience in the field of design, construction and operation of hydropower projects, came together in 2005 to form JES Pvt. Ltd. to study and design hydropower projects with special focus on small and medium size projects. Later, as the energy need of the nation grew for construction of larger projects, we went on expanding our group. To match the pace of the development, TAC Hydro Engineers was established, which then expanded into TAC Hydro Consultancy. At present, TAC Hydro Consultancy Pvt. Ltd. undertakes jobs such as project identification, desk study, site surveys, feasibility study, detail engineering design, due diligence for financing, construction supervision, banks' technical consultancy, testing and commissioning of hydropower projects.
Our Services
What we do ?
Project Development
Project identification
Desk Study
Topographical Survey
Feasibility Study
Due Diligence
Engineering support during development
Project Engineering
Detail engineering design
Bidding and Contract Documents preparation
Bid evaluation & selection
Project Management
Construction Supervision
Bill verification and Cost Control
Contract management
Specialized Hydromech, Works
Fabrications Design
Hydromechanical Installation Support.
Product Development
Structural Analyses (FEA)
Hydraulic Analyses (CFD)
Innovative Design
Our Mission
Our mission is to:
- be a competitive hydropower engineering service provider
- provide innovative engineering solutions & supervision of projects works
- be committed to protect the environment
- maximize value for all stakeholders
- be committed to fulfill Government rules and regulations


Our Projects
Inspiration for Your Next Project
Kasuwa Khola Hydropower Ltd.
Detail Engineering Design of Kasuwa Khola Hydropower Project, 45 MW, Sankhuwasabha
Darchula Power Pvt. Ltd.
Detail Engineering Design of Middle Chameliya Hydropower project, 28 MW, Darchula
Halesi Hydropower Pvt. Ltd.
Feasibility and Detail Engineering Design Rawa Khola Hydropower project, 5.3 MW, Khotang
Manakamana Engineering Hydropower Pvt. Ltd.
Detail Engineering Design and Construction Supervison of Ghatte Khola Small Hydropower Project, 5 MW, Dolakha
Him River Pvt. Ltd.
Detail Engineering Design and Construction Supervison of Liping Khola Hydropower Project, 16.2 MW, Sindhupalchowk
API Power Ltd.
Detail Hydromechanical Design of Upper Chameliya, 40MW Darchula
Don't Know What To Start With?
Office
Head Office
Phone: 01-5522896
Email: service@tachydro.com